Archive for March 4th, 2010

Top 5 Reasons to Use Design-Build on Public Projects – No. 5: The Old Criticisms Don’t Make Sense

Thursday, March 4, 2010 20:22 No Comments

Opponents of design-build have two primary objections to the method:  1) it removes control of the project from the agency (placing it with the design-build team); and 2) it results in a less than adequate design.  These arguments – which stem from the inherent adversarial relationship between architects and contractors in the competitive bidding arena [...]

This was posted under category: Design-Build Contracting Best Practices, Public Design-Build